2018 House Goals

No preamble; let’s do this! Here are 3 big things I want to get done in 2018.

1. Fix Up the Staircase

You’ve seen this central staircase in previous posts (e.g. our half bathroom). What you haven’t seen in great detail is what poor shape it’s in! The balusters have 100 years of paint glommed onto them. The risers are beat up and the treads are poorly stained. The cove moulding is half stained / half painted – maybe there used to be a runner rug?

StairsBefore.jpg

If you follow me on Instagram, you already know that I’ve started working on this project. (I have process shots pinned to my Instagram Stories, if you’re interested.) This staircase will be a very slow slog, but what else am I going to do with my free time? Relax? Pshaw.

Cat on Stairs.jpg

That’s Doozy doing his Lucille Bluth wink.

2. Install New Moulding

Friends: I struggle with the spelling of “moulding” vs. “molding.” I prefer the former. The latter looks like a verb, but it seems like it’s more commonly used online.

Anyway, I am sticking with moulding-with-a-u, and this is the year it will happen. I want to replace the existing trim on our front door, back door, passageways, etc. I bought a brad nailer (this Ryobi AirStrike) and am figuring out my plan of attack. This photo is from today, when I was experimenting with options. (That architrave would be cut shorter, obviously.)

Moulding Mock Up.jpg

This style and scale looks much better and more appropriate for the house than the moulding you see behind it, on the doorway leading to the kitchen, which leads me to my final to-do…

3. Makeover the Kitchen

I had initially thought I would fully renovate this kitchen, which is what I mentioned in this kitchen progress blog post. Having lived with the kitchen for over two years, however, I’ve come to realize it’s not a priority for me.

Current Kitchen.jpg

Knowing me and my particular tastes, a full remodel would easily cost over $25,000 (and that’s being conservative). This kitchen isn’t a $25k+ problem I want or need to solve. The layout works well for us, the cabinets are fine, and I love the huge island. So, I plan to do a make-it-work makeover: professionally painted cabinets, new hardware, new appliances, better decoration, etc.

So, those are the big 3! There will surely be other projects along the way – including some leftovers from my 2017 list [shame] – I’ll do my best to keep the blog posts coming!

P.S. Shoutout to Megan from Roots Pizza – thank you for introducing yourself and for reading!

7 thoughts on “2018 House Goals”

  1. Great projects! I have the same kitchen cabinets (and same pulls) – they were in the house when we bought them. Do you know if they are Ikea?

    1. Thanks! I’m not sure where they got the cabinets, but I can tell they’re not IKEA (e.g. the wood quality, drawer tracks, and hinges are different).

    1. OMG, you are so much braver than I am. I know this is something people have successfully pulled off – and I’d be willing to risk it myself if it would just be for a couple years – but the thought of looking at my own sub-par paint job for 10 years is too daunting! Godspeed to you!

Tell me something!

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s